Ship Loader Installation - Port of Brisbane

Ship loader, Port of Brisbane

The New Hope Group, a South-East Queensland based diversified energy company, undertook a rebuild of their Queensland Bulk Handling ship loader in 2012.

JPR was commissioned to undertake a major electrical upgrade, which included the design and installation of a new switch room, control cabinet and a complete rewire of the whole ship loader.

In November 2016, the ship loader sustained significant damage from a severe weather event. JPR was engaged to manage repairs, including disconnection of equipment on the boom while a new one was manufactured by JPR. Once the new boom was installed JPR was required to reinstall electrical devices, reconnect and recommission.

Location

Port of Brisbane

Client

New Hope Group, Queensland Bulk Handling

Scope

A major electrical upgrade, which included the design and installation of a new switch room, control cabinet and a complete rewire of the whole ship loader.

Contract Value

$2.1 Million

Start Date

01/03/2012

Completion Date

01/12/2012

All electrical works were carried out with round the clock shifts, and were completed ahead of schedule.

Early completion of repairs
Port of Brisbane, Ship Loader

  • 10

    Project Duration (months)

  • $ 2.1 m

    Contract Value